We are proud to continue our longstanding partnership with NG Bailey, having successfully delivered a wide range of projects over the years, including white and yellow line painting. Pictures show the before and after.
The scope of work included:
Removal of old line markings and wording
Thorough area preparation to eliminate debris and ensure surface readiness
Application of new white and yellow line markings for improved visibility and safety
Installation of new safety signage:
‘Mind the Gap’ and ‘Mind the Step’
We’re proud to continue our longstanding partnership with Arriva, delivering bench rejuvenation works across their network. Our continued collaboration reflects our commitment to quality, reliability, and maintaining public spaces to the highest standards. Pictures show the before and after.
The scope of work included:
Tightening and securing all loose slats and armrests
Sanding down all benches to prepare for treatment
Applying wood stain to restore and protect the timber
Finishing with a durable varnish for longevity
Painting of metal bench structures for a refreshed appearance
As part of our ongoing partnership with Transport for London, we successfully delivered a comprehensive refurbishment of Bruce Grove Station. The works were extensive and aimed at both modernising the facility and preserving its heritage features.
The scope of work included:
Installation of new flooring
Window replacements
Structural repair works
Brickwork cleaning
Canopy refurbishment
Heritage painting and decorating
De-vegetation and site clearance
Lead and asbestos removal
Full electrical upgrades
Kitchen installation
Installation of guttering and downpipes
Roof replacement & Chimney pot refurbishment
As part of our work with Royal Mail, we carried out Specialist mechanical and electrical works, including excavation and the installation of an underground torpedo joint. Pictures show the before and after.
The scope of work included:
Excavation of the required area to safely access existing underground services
Installation of a torpedo joint to securely connect and protect electrical cables, ensuring long-term performance and environmental sealing
Making good of the area, including backfilling, surface reinstatement, and restoring the site to its original condition
As part of our work with Transport for London, we carried out a variety of tasks — including the installation of new waiting shelters. Pictures show the before and after of instillation.
The scope of work included:
Removal of existing shelters and benches
Removal of signage and information boards
Installation of new modern shelters and seating
Electrical works, including installation of lighting
Reinstallation of signage and information boards
Removal and reinstallation of fencing
As part of our works with Hochtief, we carried out hatching line painting on the platforms. Pictures show the before and after of the hatchings at Manor Park Station.
The scope of work included:
Removal of old yellow hatchings
Thorough area preparation to eliminate debris and ensure surface readiness
Application of new yellow hatchings for improved visibility and safety
